AVPM’s Engineers testing baggage handling system at Cam Ranh Airport Phase 1.
In March 2021, AVPM delivered 5 units of NBL belt loader to 4 ACV branches….
In January 2021, AVPM delivered 3 units of TPX200MTX to 03 Viags branches. Our engineers…
The Baggage handling system at Cam Ranh Airport Phase 1B is under implementation. Phase 1B…
AVPM’s engineers install and instruct how to usethe mobile steering support system for 5K and…
AVPM’s Engineers do commissioning and training of 01 TMX-150-12 for VAECO during the pandemic Covid-19.
AVPM’s Engineers do commissioning and training of 04 Passenger Stairs ABS 580 for ACV at…
On Behalf of Garsite, AVPM’s Engineer flight over to Taiwan to do Warranty repairing Refuelers…